As of 7 October 2026, Semicon 2.0 has been approved by the Union Cabinet (15 July 2026) with a total outlay of Rs 1,27,500 crore across six pillars, notified in the Gazette on 31 August 2026, and given guidelines for Pillars 2–4 (machines and materials, fabs, ATMP/OSAT) on 16 September 2026. Those guidelines open applications for three years from their issue date, but a live Semicon 2.0 applicant portal was not observed and guidelines for Pillars 1, 5 and 6 were not found. No project has been approved under Semicon 2.0; on 17 September 2026 the Minister cited about Rs 1 lakh crore of investment commitments received — commitments, not approvals.
Furthest documented stage as of 2026-10-07: Application process available
Scope. The successor programme to Semicon 1.0, from its first public signalling (September 2025) to its current documented stage. Excludes projects approved under Semicon 1.0.
Updated · Sources checked 2026-10-07 — no material change found
Administered by Ministry of Electronics and Information Technology
Lifecycle: what is documented
Each stage is a separate claim with its own evidence. An announcement proves only that an announcement occurred; it is not evidence of the later stages.
-
Proposed
At SEMICON India 2025 the Government says it is preparing to launch ISM 2.0 covering fabs, OSAT, equipment and materials.
-
Announced
Union Budget 2026-27 announces ISM 2.0, with a Rs 1,000 crore provision for FY 2026-27.
Budget date from ISM listing; read via PIB backgrounder dated 2026-02-07.
Union Cabinet approves Semicon 2.0 with total budget outlay of Rs 1,27,500 crore across six pillars.
-
Formally issued
Scheme notified in Gazette (Extraordinary No. 235): six pillars, ten categories; ISM nodal agency; projects preferably up to six years.
Guidelines issued for Pillars 2-4 (Machines and Materials, Fabs, ATMP/OSAT).
-
Effective
Not evidenced as of 2026-10-07.
-
Application process available
Per guidelines, Pillars 2-4 open for online applications for three years from the date guidelines were issued.
Opening inferred from guideline text; a live Semicon 2.0 applicant portal was not observed (ISM site shows only "Applicant Login (Semicon 1.0)"). Guidelines for Pillars 1, 5, 6 not found on ISM listing.
-
Implementation evidenced
Not evidenced as of 2026-10-07.
Who is responsible
- Ministry of Electronics and Information TechnologyOwns the Semicon India Programme. The India Semiconductor Mission (a division of Digital India Corporation under MeitY) is the nodal agency; since the 9 June 2023 gazette amendment, applications are appraised on an ongoing basis and placed by MeitY before the Union Cabinet for approval.
Latest material changes
- 2026-09-16Guidelines issued for Pillars 2–4; applications open for three years from issue per the guideline text.
- 2026-08-31Semicon 2.0 notified in the Gazette (Extraordinary No. 235): six pillars, ten categories, ISM as nodal agency.
- 2026-07-15Union Cabinet approved Semicon 2.0 with a Rs 1,27,500 crore outlay.
- 2026-02-01Union Budget 2026-27 announced ISM 2.0 with a Rs 1,000 crore provision for 2026-27.
What remains unknown
Questions we could not settle from documents available to us. Unknown is not "no": it means the evidence was not found, not that the answer is negative.
- Is a Semicon 2.0 application portal live? — The guideline text opens applications from 16 September 2026; ISM's site showed only a Semicon 1.0 applicant login.
- Have guidelines for Pillars 1 (design), 5 (R&D) and 6 (talent) been issued? — Not found on ISM's guidelines listing.
- Does Semicon 2.0 cover technology-transfer and land costs? — Reported in news as not intended; not established from the gazette or guidelines read.
- What capital-support percentages apply to each Semicon 2.0 category? — Reported in news (as lower than Semicon 1.0's 50% for fabs); not read in the scheme documents.
Questions this page answers
- Has Semicon India 2.0 been notified, and what changed from the first phase?
- Yes. Semicon 2.0 was approved by the Union Cabinet on 15 July 2026 with a Rs 1,27,500 crore outlay (against Rs 76,000 crore for Semicon 1.0), notified in the Gazette on 31 August 2026, and given guidelines for its machines-and-materials, fabs and ATMP/OSAT pillars on 16 September 2026. It is organised in six pillars rather than Semicon 1.0's four schemes. No project had been approved under it as of 7 October 2026.
- What are the six pillars of Semicon 2.0?
- Design; machines and materials; fabs; ATMP/OSAT; research and development; and talent. The scheme notified on 31 August 2026 organises them into ten categories, with the India Semiconductor Mission as nodal agency.
- What support rates does Semicon 2.0 offer?
- Not established from the documents read. News reports relaying The Indian Express describe lower capital-support rates than Semicon 1.0's flat 50% for fabs, and no support for technology transfer or land; those are reported, not confirmed from the gazette or guidelines, and are recorded here as an open question.
- Has any project been approved under Semicon 2.0?
- No project approval was found as of 7 October 2026. On 17 September 2026 the Minister of Electronics and IT cited about Rs 1 lakh crore of investment commitments received — commitments, not Cabinet approvals.
Source register
- Prime Minister Shri Narendra Modi presented with First set of Made-in-India Chips · official · published 2025-09-02 · origin pib:2163184
- India Semiconductor Mission 2.0 (PIB Backgrounder) · official · published 2026-02-07 · origin pib:2224839
- Cabinet approves Semicon 2.0 - Government delivers on its commitment for a long-term policy support to Semiconductors in India · official · published 2026-07-15 · origin pib:2284796
- Gazette: Semicon 2.0 - Scheme for development of Semiconductor Design and Manufacturing Ecosystem in India (No. 235) · official · published 2026-08-31 · origin gazette:2026-08-31:W-38/6/2025-IPHW
- Union Minister Ashwini Vaishnaw addressed media on Semicon 2.0; Notifications for all 6 Pillars of Semicon 2.0 issued · official · published 2026-08-31 · origin pib:2304963
- MeitY: Guidelines for implementing Machines and Materials, Fabs, and ATMP/OSAT pillars under Semicon 2.0 · official · published 2026-09-16 · origin meity:semicon2-guidelines:2026-09-16
Related desks: SemiconductorsMeitY
For organisations
Need this for a decision your organisation is making?
- Monitor these institutions → We re-check the sources behind the claims you depend on and brief you when one materially changes.
- Commission a reviewed evidence pack → This evidence, re-checked against your own criteria and states, reviewed and delivered with a source register and an unknowns log.
- Compare with another state or scheme → Extend the matrix to the jurisdictions or instruments under your review.
- Submit your research question → Tell us the decision it supports and the deadline; we scope it before quoting.
We establish what is documented, what changed, who is responsible, where evidence conflicts and what remains unknown. We do not give investment, legal or policy advice — the decision stays with you or your adviser. Services · Methodology