Sample deliverable · State / Sector Evidence Pack
What a paid evidence pack looks like
This sample is assembled automatically from our public evidence on state semiconductor policy across six states and the implementation trackers. A paid pack uses the same structure, but on your criteria, your jurisdictions and your evidence standard, with a human review of every consequential interpretation.
Illustrative mandate — not a real client
Business context. An overseas electronics manufacturer is comparing Indian states for a semiconductor assembly or electronics operation ahead of an internal review.
Question. Across Gujarat, Assam, UP, Tamil Nadu, Karnataka, Telangana: which documented state frameworks apply, what do they offer on top of central support, which institutions administer them, and what is actually evidenced as operating — distinguishing announced measures from operational processes, and recording what cannot be established.
Evidence standard. Official primaries first; every cell sourced or marked unknown. As of 2026-10-07.
1. Executive summary
As of 7 October 2026, four of these six states have a dedicated semiconductor policy that adds state capital support on top of the Union's India Semiconductor Mission assistance: Gujarat and Assam add 40% of the central capex assistance, Uttar Pradesh 50%, and Tamil Nadu up to 50%. Karnataka and Telangana cover semiconductors under general electronics (ESDM) incentives, with no top-up tied to ISM support. Six of the twelve ISM-approved units are in Gujarat — including four of the five in commercial operation — one is in Assam and one in Uttar Pradesh; Tamil Nadu, Karnataka and Telangana have none. Gujarat's and Tamil Nadu's policies run to 2027, and no successor to either was found.
- 46 of 48 matrix cells are evidenced; 43 are verified against an official primary or two independent origins; 2 could not be established and are logged as open questions.
- 17 instruments are tracked stage by stage; the furthest documented stage is stated for each in section 4.
- The matrix describes; it does not rank the states. Weighting the criteria is the client's decision.
2. Comparison matrix
| Criterion | Gujarat | Assam | UP | Tamil Nadu | Karnataka | Telangana |
|---|---|---|---|---|---|---|
| Governing instrument | Gujarat Semiconductor Policy 2022-27 (Department of Science & Technology); announced 27 July 2022 Verified | Assam Electronics (Semiconductor etc.) Policy 2023, notified 29 August 2023 (Industries, Commerce & Public Enterprises Department) Verified | Uttar Pradesh Semiconductor Policy 2024 (Department of IT & Electronics), notified c. 12 February 2024 Verified | Tamil Nadu Semiconductor and Advanced Electronics Policy 2024, released 7 January 2024; separately, Tamil Nadu Semiconductor Mission 2030 (G.O. No. 95, 14 August 2025) Verified | No current dedicated semiconductor policy found; semiconductors covered by the Special Incentives Scheme for the ESDM Sector (G.O. ITBT 101 ADM 2020, 7 September 2020) Verified | No dedicated semiconductor policy found; Telangana Electronics Policy 2016 (ITE&C) lists semiconductors as a focus area Verified |
| Operative period | 2022–2027 Verified | 5 years from notification (to August 2028) or until further orders Verified | 5 years from notification (to c. February 2029) Verified | 3 years from notification (to c. January 2027) Verified | 2020–25 per the G.O.; a state official said in June 2026 it is extended to 2030 Single source | — Unknown |
| Capital support on top of ISM | 40% of the capital assistance approved by the Government of India under ISM Verified | Additional 40% of the capex assistance given by the Government of India Verified | Additional capital subsidy of 50% of the capital subsidy approved by the Government of India, released pari passu after the central share Verified | Up to 50% of the capex assistance provided by the Government of India, for ISM-approved units; routed via escrow with SIPCOT Verified | No top-up tied to ISM support; a 20% capital investment subsidy on plant and machinery, stackable with central incentives Verified | No top-up tied to ISM support; semiconductors get unspecified 'special incentives', and mega projects case-by-case packages Verified |
| Land and power concessions | 75% land subsidy on the first 200 acres for a fab in Dholera SIR (50% beyond); Rs 2/unit power tariff subsidy for 10 years; electricity duty exemption; stamp duty reimbursed Verified | Land at nominal prices or freehold case by case; 100% stamp duty exemption; power tariff incentive up to 50% for 10 years; water at Rs 5/m³ for 10 years Verified | 75% land rebate on the first 200 acres (30% beyond, for ATMP/OSAT); 100% stamp duty; 100% electricity duty exemption for 10 years; 50% transmission/wheeling waiver for 25 years Verified | SIPCOT land at 10% concession (A/B districts) or 50% (C districts), capped at 20% of eligible fixed assets; 100% stamp duty on SIPCOT land; electricity tax exemption for 5 years Verified | 25% land subsidy outside Bengaluru Urban/Rural (up to 50 acres); stamp duty and conversion fee reimbursed; Rs 1/unit power tariff reimbursement and electricity duty exemption for 5 years Verified | Land at affordable cost plus 25% lease-rental subsidy for 10 years; electricity duty exemption for 5 years (generic electronics terms) Verified |
| Administering body | Gujarat State Electronics Mission (GSEM), under the Department of Science & Technology Verified | Industries, Commerce & Public Enterprises Department; an Empowered Committee chaired by the department's Minister approves incentives (state Cabinet for mega projects) Verified | UP Electronics Corporation Ltd (UPLC), under the Department of IT & Electronics; Empowered Committee chaired by the Chief Secretary Verified | Industries, Investment Promotion & Commerce Department sanctions on Guidance Tamil Nadu's proposal; SIPCOT disburses Verified | Department of Electronics, IT, BT issues the scheme; Karnataka Innovation & Technology Society (KITS) administers it Single source | ITE&C Department; the Consultative Committee on ESDM (CCESDM) administers incentives; TS-iPASS for clearances Verified |
| Documented application route | Yes — GSEM 'Apply for incentives' links to the DST policy portal (registration → expression of interest → in-principle approval → claim → disbursement) Verified | — Unknown | Yes — via the Nivesh Mitra single-window portal (Online Incentive Management System), filed alongside the ISM application Verified | Yes — through Guidance Tamil Nadu's single-window portal; incentive procedure per the Industrial Policy 2021 operational guidelines Verified | KESDM registration with KITS (one-time Rs 10,000 + GST), per a KITS official; no public online portal verified Reported | A 2016-era route: online common application plus a physical copy to CCESDM; clearances via TS-iPASS Verified |
| ISM-approved units in the state | 6 of 12: Micron ATMP, Tata–PSMC fab, CG Semi OSAT, Kaynes OSAT (Sanand/Dholera); Crystal Matrix GaN unit (Dholera); Suchi Semicon OSAT (Surat) Verified | 1: Tata Semiconductor Assembly and Test ATMP, Jagiroad (Morigaon), approved 29 Feb 2024 Verified | 1: HCL–Foxconn JV (India Chip Pvt Ltd) OSAT near Jewar, approved 14 May 2025 Verified | None Verified | None Verified | None Verified |
| ISM units operating | 4 units in commercial operation: Micron (28 Feb 2026), Kaynes (31 Mar 2026), CG Semi (4 Jul 2026), Suchi (17 Sep 2026). Dholera fab under construction Verified | None in commercial operation. Tata Jagiroad under construction; pilot output reported 3 Oct 2026 on the Chief Minister's statement, unconfirmed by ISM Verified | None in commercial operation; HCL–Foxconn foundation stone laid 21 Feb 2026 Verified | Not applicable — no ISM unit in the state Verified | Not applicable — no ISM unit in the state Verified | Not applicable — no ISM unit in the state Verified |
3. Institutional responsibility map
- Ministry of Electronics and Information TechnologyUnion: owns the Semicon India Programme; ISM is the nodal agency and the Union Cabinet approves units. State top-ups are expressed relative to this central assistance.
- GujaratGujarat State Electronics Mission (GSEM), under the Department of Science & Technology.
- AssamIndustries, Commerce & Public Enterprises Department, through an Empowered Committee.
- Uttar PradeshUP Electronics Corporation Ltd under the Department of IT & Electronics; Empowered Committee chaired by the Chief Secretary.
- Tamil NaduIndustries, Investment Promotion & Commerce Department with Guidance Tamil Nadu; SIPCOT disburses.
- KarnatakaDepartment of Electronics, IT, BT; Karnataka Innovation & Technology Society (reported) administers.
- TelanganaITE&C Department; Consultative Committee on ESDM.
4. Implementation status of the instruments
- ASIP OSAT unit, Visakhapatnam — furthest documented stage: Construction started
- CDIL discrete semiconductor expansion, Mohali — furthest documented stage: Commercial operation
- 3D Glass Solutions advanced packaging unit, Bhubaneswar — furthest documented stage: Construction started
- CG Semi OSAT plant, Sanand — furthest documented stage: Commercial operation
- Crystal Matrix GaN Micro-LED unit, Dholera — furthest documented stage: Approved
- HCL–Foxconn semiconductor unit, Jewar (Uttar Pradesh) — furthest documented stage: Construction started
- India's display fab scheme (Modified Semicon 1.0) — furthest documented stage: Application process available
- Design Linked Incentive (DLI) scheme — furthest documented stage: Implementation evidenced
- India's ATMP/OSAT and compound semiconductor scheme (Modified Semicon 1.0) — furthest documented stage: Implementation evidenced
- India's semiconductor fab scheme (Modified Semicon 1.0) — furthest documented stage: Implementation evidenced
- Kaynes Semicon OSAT plant, Sanand — furthest documented stage: Commercial operation
- Micron ATMP plant, Sanand — furthest documented stage: Commercial operation
- SiCSem silicon carbide fab, Bhubaneswar — furthest documented stage: Construction started
- Semicon India 2.0 (ISM 2.0) — furthest documented stage: Application process available
- Suchi Semicon OSAT plant, Surat — furthest documented stage: Commercial operation
- Tata semiconductor assembly and test plant, Jagiroad (Assam) — furthest documented stage: Pilot output
- Tata Electronics–PSMC semiconductor fab, Dholera — furthest documented stage: Construction started
5. Assumptions register
Each fact the analysis relies on, with its date and strength. In a Maintained India Desk, these are the claims we re-check and alert on.
| Assumption | Value | Status | As of |
|---|---|---|---|
| Gujarat — Governing instrument | Gujarat Semiconductor Policy 2022-27 (Department of Science & Technology); announced 27 July 2022 | Verified· official | 2026-09 |
| Gujarat — Operative period | 2022–2027 | Verified· official | 2026-10 |
| Gujarat — Capital support on top of ISM | 40% of the capital assistance approved by the Government of India under ISM | Verified· official | 2026-09 |
| Gujarat — Land and power concessions | 75% land subsidy on the first 200 acres for a fab in Dholera SIR (50% beyond); Rs 2/unit power tariff subsidy for 10 years; electricity duty exemption; stamp duty reimbursed | Verified· official | 2026-09 |
| Gujarat — Administering body | Gujarat State Electronics Mission (GSEM), under the Department of Science & Technology | Verified· official | 2026-09 |
| Gujarat — Documented application route | Yes — GSEM 'Apply for incentives' links to the DST policy portal (registration → expression of interest → in-principle approval → claim → disbursement) | Verified· official | 2026-09 |
| Gujarat — ISM-approved units in the state | 6 of 12: Micron ATMP, Tata–PSMC fab, CG Semi OSAT, Kaynes OSAT (Sanand/Dholera); Crystal Matrix GaN unit (Dholera); Suchi Semicon OSAT (Surat) | Verified· official | 2026-05-05 |
| Gujarat — ISM units operating | 4 units in commercial operation: Micron (28 Feb 2026), Kaynes (31 Mar 2026), CG Semi (4 Jul 2026), Suchi (17 Sep 2026). Dholera fab under construction | Verified· official | 2026-09-17 |
| Assam — Governing instrument | Assam Electronics (Semiconductor etc.) Policy 2023, notified 29 August 2023 (Industries, Commerce & Public Enterprises Department) | Verified· official | 2026-10 |
| Assam — Operative period | 5 years from notification (to August 2028) or until further orders | Verified· official | 2026-10 |
| Assam — Capital support on top of ISM | Additional 40% of the capex assistance given by the Government of India | Verified· official | 2026-10 |
| Assam — Land and power concessions | Land at nominal prices or freehold case by case; 100% stamp duty exemption; power tariff incentive up to 50% for 10 years; water at Rs 5/m³ for 10 years | Verified· official | 2026-10 |
| Assam — Administering body | Industries, Commerce & Public Enterprises Department; an Empowered Committee chaired by the department's Minister approves incentives (state Cabinet for mega projects) | Verified· official | 2026-10 |
| Assam — ISM-approved units in the state | 1: Tata Semiconductor Assembly and Test ATMP, Jagiroad (Morigaon), approved 29 Feb 2024 | Verified· official | 2024-02-29 |
| Assam — ISM units operating | None in commercial operation. Tata Jagiroad under construction; pilot output reported 3 Oct 2026 on the Chief Minister's statement, unconfirmed by ISM | Verified· official | 2026-10-03 |
| UP — Governing instrument | Uttar Pradesh Semiconductor Policy 2024 (Department of IT & Electronics), notified c. 12 February 2024 | Verified· official | 2026-10 |
| UP — Operative period | 5 years from notification (to c. February 2029) | Verified· official | 2026-10 |
| UP — Capital support on top of ISM | Additional capital subsidy of 50% of the capital subsidy approved by the Government of India, released pari passu after the central share | Verified· official | 2026-10 |
| UP — Land and power concessions | 75% land rebate on the first 200 acres (30% beyond, for ATMP/OSAT); 100% stamp duty; 100% electricity duty exemption for 10 years; 50% transmission/wheeling waiver for 25 years | Verified· official | 2026-10 |
| UP — Administering body | UP Electronics Corporation Ltd (UPLC), under the Department of IT & Electronics; Empowered Committee chaired by the Chief Secretary | Verified· official | 2026-10 |
| UP — Documented application route | Yes — via the Nivesh Mitra single-window portal (Online Incentive Management System), filed alongside the ISM application | Verified· official | 2026-10 |
| UP — ISM-approved units in the state | 1: HCL–Foxconn JV (India Chip Pvt Ltd) OSAT near Jewar, approved 14 May 2025 | Verified· official | 2026-04-01 |
| UP — ISM units operating | None in commercial operation; HCL–Foxconn foundation stone laid 21 Feb 2026 | Verified· official | 2026-09-17 |
| Tamil Nadu — Governing instrument | Tamil Nadu Semiconductor and Advanced Electronics Policy 2024, released 7 January 2024; separately, Tamil Nadu Semiconductor Mission 2030 (G.O. No. 95, 14 August 2025) | Verified· official | 2026-10 |
| Tamil Nadu — Operative period | 3 years from notification (to c. January 2027) | Verified· official | 2026-10 |
| Tamil Nadu — Capital support on top of ISM | Up to 50% of the capex assistance provided by the Government of India, for ISM-approved units; routed via escrow with SIPCOT | Verified· official | 2026-10 |
| Tamil Nadu — Land and power concessions | SIPCOT land at 10% concession (A/B districts) or 50% (C districts), capped at 20% of eligible fixed assets; 100% stamp duty on SIPCOT land; electricity tax exemption for 5 years | Verified· official | 2026-10 |
| Tamil Nadu — Administering body | Industries, Investment Promotion & Commerce Department sanctions on Guidance Tamil Nadu's proposal; SIPCOT disburses | Verified· official | 2026-10 |
| Tamil Nadu — Documented application route | Yes — through Guidance Tamil Nadu's single-window portal; incentive procedure per the Industrial Policy 2021 operational guidelines | Verified· official | 2026-10 |
| Tamil Nadu — ISM-approved units in the state | None | Verified· official | 2026-07-15 |
| Tamil Nadu — ISM units operating | Not applicable — no ISM unit in the state | Verified· official | 2026-09-17 |
| Karnataka — Governing instrument | No current dedicated semiconductor policy found; semiconductors covered by the Special Incentives Scheme for the ESDM Sector (G.O. ITBT 101 ADM 2020, 7 September 2020) | Verified· official | 2026-10 |
| Karnataka — Operative period | 2020–25 per the G.O.; a state official said in June 2026 it is extended to 2030 | Single source· gdelt | 2026-06-10 |
| Karnataka — Capital support on top of ISM | No top-up tied to ISM support; a 20% capital investment subsidy on plant and machinery, stackable with central incentives | Verified· official | 2026-10 |
| Karnataka — Land and power concessions | 25% land subsidy outside Bengaluru Urban/Rural (up to 50 acres); stamp duty and conversion fee reimbursed; Rs 1/unit power tariff reimbursement and electricity duty exemption for 5 years | Verified· official | 2020-09-07 |
| Karnataka — Administering body | Department of Electronics, IT, BT issues the scheme; Karnataka Innovation & Technology Society (KITS) administers it | Single source· gdelt | 2026-06 |
| Karnataka — Documented application route | KESDM registration with KITS (one-time Rs 10,000 + GST), per a KITS official; no public online portal verified | Reported· gdelt | 2026-06-10 |
| Karnataka — ISM-approved units in the state | None | Verified· official | 2026-07-15 |
| Karnataka — ISM units operating | Not applicable — no ISM unit in the state | Verified· official | 2026-09-17 |
| Telangana — Governing instrument | No dedicated semiconductor policy found; Telangana Electronics Policy 2016 (ITE&C) lists semiconductors as a focus area | Verified· official | 2026-10 |
| Telangana — Capital support on top of ISM | No top-up tied to ISM support; semiconductors get unspecified 'special incentives', and mega projects case-by-case packages | Verified· official | 2026-10 |
| Telangana — Land and power concessions | Land at affordable cost plus 25% lease-rental subsidy for 10 years; electricity duty exemption for 5 years (generic electronics terms) | Verified· official | 2026-10 |
| Telangana — Administering body | ITE&C Department; the Consultative Committee on ESDM (CCESDM) administers incentives; TS-iPASS for clearances | Verified· official | 2026-10 |
| Telangana — Documented application route | A 2016-era route: online common application plus a physical copy to CCESDM; clearances via TS-iPASS | Verified· official | 2026-10 |
| Telangana — ISM-approved units in the state | None | Verified· official | 2026-07-15 |
| Telangana — ISM units operating | Not applicable — no ISM unit in the state | Verified· official | 2026-09-17 |
6. Unresolved questions
- Assam: Documented application route — The policy defers to operational guidelines; neither guidelines nor an online portal were found.
- Telangana: Operative period — No operative-period clause found; the policy's targets run to 2020, yet ITE&C still lists it as current.
- Do the Gujarat, Assam, Uttar Pradesh and Tamil Nadu top-ups apply to projects approved under Semicon 2.0? — Each is written against ISM capex assistance; none of the state documents read addresses Semicon 2.0, notified on 31 August 2026.
- Will Gujarat (2022-27) and Tamil Nadu (to c. January 2027) renew or replace their policies? — No successor or extension found; this records the absence, not a forecast.
- Has Karnataka extended its ESDM scheme to 2030, and on what terms? — Only a news report quoting an official; no order found.
- Do Assam's operational guidelines exist, and is there an application portal? — The policy defers to guidelines that were not found.
- Is Telangana's 2016 electronics policy still operative? — No operative-period clause; still listed as current by the department.
In a paid pack, each open question comes with the route to close it (document request, local-language review, specialist check) and its cost, for your approval.
7. Source register
- Gujarat Semiconductor Policy – Gujarat State Electronics Mission · official
- Gujarat Semiconductor Policy – DST Gujarat · official
- DeshGujarat — Gujarat government announces Semiconductor policy 2022-2027 · official
- KCM Flash – Gujarat Semiconductor Policy 2022-27 (summary) · official
- Apply for incentives – GSEM · official
- Cabinet approves three more semiconductor units · official
- Cabinet approves two more semiconductor manufacturing units (Gujarat) · official
- PM inaugurates Micron's ATMP facility in Sanand · official
- PM inaugurates the Kaynes Semicon Plant at Sanand · official
- PM inaugurates the CG Semi OSAT facility in Sanand · official
- PM inaugurates SEMICON India 2026 · official
- Assam Electronics (Semiconductor etc.) Policy 2023 — notification, Industries, Commerce & PE Dept · official
- Uttar Pradesh Semiconductor Policy-2024 – Invest UP · official
- Uttar Pradesh Semiconductor Policy 2024 (notification PDF, scanned) · official
- Cabinet approves semiconductor unit in Uttar Pradesh · official
- Semicon India Programme — Lok Sabha reply listing approved projects · official
- All India Radio — PM virtually lays foundation stone of HCL-Foxconn JV project · official
- Tamil Nadu Semiconductor and Advanced Electronics Policy 2024 (Guidance Tamil Nadu) · official
- The News Minute — Highlights from TN Global Investors Meet day 1 · official
- Tamil Nadu Semiconductor Mission 2030 — G.O.(Ms.) No.95 (scanned) · official
- Karnataka G.O. ITBT 101 ADM 2020 — Special Incentives Scheme for ESDM Sector (2020-25) · official
- Dataquest — Karnataka Government provides details of ESDM policies · gdelt
- Telangana Electronics Policy 2016 (ITE&C, scanned) · official